We design, permit and install complete septic systems for new construction, additions and properties without existing service.

Overview

New Septic Installation

A properly designed system begins with an accurate understanding of the site. We evaluate your soil and groundwater conditions, design a system sized to your home, secure the required approvals and complete the installation in coordination with your builder.

Stone leach field with distribution box and laterals built by Leave It Too Us

What's included

  • Soil evaluation and percolation testing
  • System design sized to bedroom count and soil conditions
  • Permit applications and health department coordination
  • Excavation, tank placement and drain field construction
  • Final inspection, backfill and site restoration

When you may need this service

  • Building a new single-family home
  • Adding bedrooms that increase required system capacity
  • Developing an undeveloped or rural lot
  • Converting a seasonal property to year-round use
Common Questions

Frequently asked questions.

How long does a new installation take?

Most residential installations take three to seven working days on site. Design and permitting typically take several weeks and are completed before excavation begins.

What type of system will my property need?

The system type is determined by soil absorption rates, depth to seasonal groundwater and available space. We present the options permitted for your site after the evaluation.

Can you coordinate with my builder?

Yes. We schedule around foundation, well and utility work so the septic system does not delay construction.

Related Work

Recent projects.

New 1,250-gallon septic tank set in place
Tank
Stone leach field with distribution box and laterals
Leach field
Site seeded and mulched with straw
Completed
Septic Replacement & Repair

1,250-gallon septic tank and leach field

Eastern Connecticut

Residential · 1,250-gallon plastic tank and stone leach field

Set a new 1,250-gallon two-compartment plastic septic tank and built a stone leach field with perforated laterals fed from a distribution box. After inspection, the site was backfilled, graded, seeded and mulched with straw, with silt fence installed for erosion control.

New tank with risers and PVC line bedded in sand
Tank and line
Site brought to final grade with silt fence in place
Final grade
Septic Replacement & Repair

Septic tank and sewer line replacement

Eastern Connecticut

Residential · New plastic tank with risers and PVC line

Installed a new plastic septic tank with grade-level risers and laid a new PVC line bedded in sand, working close to the home's foundation. The site was then brought to final grade with silt fence in place for erosion control.

Schedule your site evaluation.

Free on-site estimates with a written, fixed-price proposal.